Context: Unverified. The claim describes PJM's proposed Schedule 11, filed at FERC on 13 August in docket ER26-3515; that text has not been read directly. Public accounts list the fields a registry submission must contain but describe updates only as "periodic", which is consistent with the claim.
Tracked Statements (2)
Data-centre load left in PJM's capacity auctions has increased capacity costs by $29.4 billion over the last four auctions, and that number will accelerate in future auctions if PJM succeeds in increasing the maximum price in the auctions.?
Context: Unverified. The $29.4bn is now published with its method — $29,368,774,465 across four auctions, in the monitor's Q2 2026 State of the Market Report — but it remains the monitor's own calculation, uncorroborated. The forward half, acceleration under a higher price cap, awaits the December 2026 backstop auction.